EV Charging Solutions for Commercial & Government Properties

Sourcing for Level 2 and DC fast charging infrastructure built for contractors, dealerships, fleet depots, and government properties nationwide.

EV charging station installed at a commercial property

Demand for EV charging infrastructure is growing across commercial, government, and dealership properties. ATEK Distribution sources Level 2 and DC fast charging equipment and supporting electrical components for contractors installing charging stations nationwide.

EV charger installation photo IN MINNESOTA

What ATEK Provides

Level 2 and DC fast charging station sourcing

Supporting electrical distribution equipment

Panels, conduit, and wiring for charger installations.

Technical guidance on equipment selection

Matched to the site’s power and usage requirements.

Coordination with your electrician

On panel and service-capacity requirements before equipment ships.

Sourcing support for multi-site rollouts

Fleet depots, dealership networks, multi-building campuses.

Level 2 vs. DC Fast Charging

Level 2

Typical power output: 19 kW

Best fit: Fleet depots, dealerships, workplace and multifamily charging

Electrical infrastructure impact: Usually fits existing 208/240V service with a dedicated circuit; panel capacity should still be confirmed

DC Fast Charging (DCFC)

Typical power output: 50-350+ kW

Best fit: Public corridor charging, high-turnover commercial sites

Electrical infrastructure impact: Often requires a dedicated transformer or service upgrade plan the electrical scope early

How It Works

ATEK follows the same 5-step supply process used across all projects.

1. Confirm specs and timeline

2. Source the right equipment

3. Prepare and quality-check

4. Deliver on schedule

5. Verify satisfaction after installation

Why Choose ATEK

ATEK sourced EV charging stations for an AUDI dealership installation and supplies Level 2 charging equipment to homeowners and commercial property owners across Minnesota. We are SDVOSB-certified and a GSA Contract Holder, with 8+ years serving contractors and government clients nationwide.

AUDI dealership install

SDVOSB Certified

Service-Disabled Veteran-Owned Small Business

GSA Contract Holder

Eligible for federal procurement

8+ Years Experience

Serving contractors and government clients nationwide

FAQ

Does ATEK supply DC fast charging equipment as well as Level 2?

Yes. ATEK sources both Level 2 and DC fast charging infrastructure depending on project requirements.

Can ATEK support government or dealership EV charging installs?

Yes  ATEK has direct project experience sourcing EV charging stations for a commercial dealership installation and is GSA-eligible for government buyers.

What's the difference between Level 2 and DC fast charging?

Level 2 chargers run on 208/240V and typically add 10-20 miles of range per hour, suited to overnight or workplace charging. DC fast chargers deliver much higher power directly and can charge a vehicle to 80% in 20 to 40 minutes, but usually require a larger electrical service.

Does an EV charging install require an electrical service upgrade?
It depends on existing panel capacity and the charger class specified. Level 2 installs often fit within existing service; DC fast charging frequently requires a dedicated transformer or utility coordination. ATEK sources equipment to match whatever the site’s engineer or electrician specifies.
Can ATEK source EV charging equipment for a multi-site rollout?

Yes  ATEK provides sourcing coordination across multiple locations so equipment and supporting distribution gear arrive on a consistent schedule. See our Project Management page for multi-phase sourcing support.

Is ATEK's EV charging equipment eligible for federal or GSA procurement?

ATEK is a GSA Contract Holder and SDVOSB, which qualifies it for federal EV infrastructure procurement under applicable contracting vehicles.

Request a Quote