EV Charging Solutions

EV Charging Solutions for Commercial & Government Properties

Demand for EV charging infrastructure is growing across commercial, government, and dealership properties. ATEK Distribution sources Level 2 and DC fast charging equipment and supporting electrical components for contractors installing charging stations nationwide.

What ATEK Provides

  • Level 2 and DC fast charging station sourcing
  • Supporting electrical distribution equipment (panels, conduit, wiring) for charger installations
  • Technical guidance on equipment selection for the site’s power and usage requirements
  • Coordination with your electrician on panel and service-capacity requirements before equipment ships
  • Sourcing support for multi-site rollouts (fleet depots, dealership networks, multi-building campuses)
Charger type Typical power output Best fit Electrical infrastructure impact
Level 2 7–19 kW Fleet depots, dealerships, workplace and multifamily charging Usually fits existing 208/240V service with a dedicated circuit; panel capacity should still be confirmed
DC Fast Charging (DCFC) 50–350+ kW Public corridor charging, high-turnover commercial sites Often requires a dedicated transformer or service upgrade — plan the electrical scope early

How It Works

ATEK follows the same 5-step supply process used across all projects: confirm specs and timeline, source the right equipment, prepare and quality-check, deliver on schedule, and verify satisfaction after installation.

Why Choose ATEK

ATEK sourced EV charging stations for an AUDI dealership installation and supplies Level 2 charging equipment to homeowners and commercial property owners across Minnesota. We are SDVOSB-certified and a GSA Contract Holder, with 7+ years serving contractors and government clients nationwide.

FAQ

Does ATEK supply DC fast charging equipment as well as Level 2?

Yes. ATEK sources both Level 2 and DC fast charging infrastructure depending on project requirements.

Can ATEK support government or dealership EV charging installs?

Yes — ATEK has direct project experience sourcing EV charging stations for a commercial dealership installation and is GSA-eligible for government buyers.

What’s the difference between Level 2 and DC fast charging?

Level 2 chargers run on 208/240V and typically add 10–20 miles of range per hour, suited to overnight or workplace charging. DC fast chargers deliver much higher power directly and can charge a vehicle to 80% in 20–40 minutes, but usually require a larger electrical service.

Does an EV charging install require an electrical service upgrade?

It depends on existing panel capacity and the charger class specified. Level 2 installs often fit within existing service; DC fast charging frequently requires a dedicated transformer or utility coordination. ATEK sources equipment to match whatever the site’s engineer or electrician specifies.

Can ATEK source EV charging equipment for a multi-site rollout?

Yes — ATEK provides sourcing coordination across multiple locations so equipment and supporting distribution gear arrive on a consistent schedule. See our Project Management page for multi-phase sourcing support.

Is ATEK’s EV charging equipment eligible for federal or GSA procurement?

ATEK is a GSA Contract Holder and SDVOSB, which qualifies it for federal EV infrastructure procurement under applicable contracting vehicles.

Request a Quote

Request a Quote or call +1 (952) 254-1205.